The Options entry in the Index provides an overview of some of the global options that can be set by the user.

Options
Note: options that are specific for a particular net are shown in the net overviews.
Commands between autosave
Backups of all nets that are open are periodically saved. This option indicates how many commands can be executed between autosaves. Edit the number following the option to change how often the net is backed up.
Simulation report
These options determine whether or not a simulation report should be saved and how detailed the simulation report should be.
You must be logged in to post a comment.